Professionals · Surveyor or engineer (pre-purchase or structural survey)
Structural survey or engineer's report: which one do you need?
Checked 21 Oct 2026typical costs from SCSI: a guide to surveys; Bank of Ireland: the costs of buying a home (2026).
A standard pre-purchase survey looks at everything it can see. A full structural survey goes further: it concentrates on whether the building itself is sound. Both are done by a chartered engineer (on Engineers Ireland's register) or a chartered building surveyor (on the SCSI's register). This page says when the deeper survey is worth the extra cost, what it covers, and what it finds.
Check before you hire: a surveyor or engineer should be on the register kept by the Society of Chartered Surveyors Ireland or Engineers Ireland. SCSI: find a chartered surveyor
What it usually costs
| Full structural surveyFor an older home, one with an extension, cracks, or a pyrite or mica risk. | €1,500 to €3,000 + VAT |
| Survey (engineer's or surveyor's report)A standard pre-purchase report; a full structural survey of an older or altered home is more. | €300 to €600 + VAT |
Typical figures, checked 2026-10-21; never a quote. Get at least two written quotes.
The difference between the two
A standard pre-purchase survey is a visual inspection of the whole home, inside and out. It reports on the roof, the walls, damp, the windows, the heating and the services. It is the right survey for most second-hand homes, and it costs €300 to €600 plus VAT.
A full structural survey asks one question: is the building sound? The engineer looks hard at the parts that hold the home up:
- the foundations, as far as they can be judged from the outside and from cracks
- the load-bearing walls, lintels and beams
- the roof structure, in the attic, not just the tiles
- the floors, and whether a joist has been cut or has rotted
- any extension, and how it joins the original building
- movement: cracks measured and photographed, doors that stick, floors that slope
The structural report can also include opening up a small area, a drain test, or a sample of the blockwork for a pyrite or mica test. Each of those costs extra and needs the seller's permission.
You do not need both. A structural survey covers what the standard one does, in more depth, and costs more.
When a structural survey is worth it
Ask for the deeper survey when any of these is true:
- the home was built before about 1960, or has solid walls with no cavity
- there is an extension, an attic conversion, or a wall has been knocked through
- you can see cracks wider than a coin, especially stepped cracks in the brickwork
- the home is in an area with known pyrite or mica problems
- it has been empty for years, or it is derelict
- you plan to renovate, extend or take walls out, and you need to know what you are starting with
- a standard survey said to refer it to a structural engineer
The last one is common. A building surveyor sees a crack, cannot say what caused it, and asks for an engineer. Paying for the engineer at that point is the right call: a crack can be nothing, or it can be a foundation problem that costs tens of thousands.
For a vacant or derelict home, the structural survey comes before you bid, not after sale agreed. The grant works are costed from it.
What it costs
A full structural survey costs €1,500 to €3,000 plus VAT at 23%. The range depends on the size and age of the home, how far the engineer travels, and whether any tests are added.
Tests on top:
- a pyrite or mica test of the blockwork or the hardcore under the floor: a sample is taken and sent to a laboratory, and the fee depends on the number of samples
- a drain survey with a camera
- a damp specialist's report
Ask for each as a separate line on the quote. You may not need all of them, and the engineer should say which ones matter for this home.
Against that, set what it protects. A home with a structural problem can be very hard to sell on, and a lender may refuse to lend on it at all. The engineer's report is also what you use to go back on the price, or to show the lender that a problem has been assessed and can be fixed.
The table below gives the typical ranges from our costs config, not a quote.
Pyrite, mica and the tests
Pyrite and mica are minerals found in some building blocks and in the hardcore under floors. When they take in water they swell or crumble, and the walls or floors crack. Homes built in the 2000s in some counties are affected. A government redress scheme exists for some owners, but a buyer cannot count on it.
If the home is in an affected area, or was built in the years when the problem happened, ask the engineer about a test. A test means taking a core sample from a wall or the floor and sending it to a laboratory. The seller must agree, and the hole is made good afterwards.
A clear test does not cover every wall, but it is the only evidence there is. Without one, a lender may still lend, but a future buyer's engineer will ask the same question. If the seller refuses a test on a home in an affected area, treat that as a warning.
What happens after the report
The report gives each defect a cause, a severity and a fix, often with a rough cost. Three outcomes are common:
- The building is sound. Normal cracks from the home settling, nothing structural. You go ahead, with a budget for the ordinary repairs.
- A problem with a fix. A lintel to replace, a wall to tie, a floor to relay. Get a builder's quote, then go back to the seller through the agent, in writing, with the report attached. You can ask for a price drop or walk away before contracts.
- A problem without a clear fix. Ongoing movement, a failed foundation, a positive pyrite or mica test. Most people walk away. If you go ahead, tell your lender: it may want the engineer's report before the loan offer, and it may refuse.
Send the report to your solicitor either way. Any extension or structural change without planning permission or a certificate of compliance goes into their questions on the title.
Questions to ask
- Are you a chartered engineer or chartered building surveyor, and is structural work your field?
- From what you know of this home, do I need the full structural survey or the standard one?
- What will you open up or test, and what does each test cost?
- Have you seen pyrite or mica in this area or this estate?
- Will the report give a cause, a severity and a rough cost for each defect?
- How long until I get the report, and will you talk me through it?
- Do you have professional indemnity insurance that covers structural reports?
Warning signs
- Not on the Engineers Ireland or SCSI register
- Offers a structural survey at the price of a standard one, without opening anything up
- Will not say what the tests cost or whether they are needed
- The seller refuses a pyrite or mica test on a home in an affected area
- A report that lists defects with no cause and no next step
Questions people ask
What is the difference between a structural survey and an engineer's report?
People use the names loosely. A standard pre-purchase report is a visual check of the whole home. A full structural survey goes deeper into the structure: foundations, load-bearing walls, the roof frame, movement, and tests where needed. Ask the surveyor which one they are quoting for.
How much does a structural survey cost in Ireland?
€1,500 to €3,000 plus VAT for a full structural survey, with laboratory tests, a drain camera or a damp specialist on top where they are needed. A standard survey is €300 to €600 plus VAT.
Do I need a structural survey on an old house?
Usually, yes, on a home built before about 1960, one with an extension or an attic conversion, one with visible cracks, or one in a pyrite or mica area. For a newer home with no alterations, a standard survey is usually enough.
Will the lender lend on a house with a structural problem?
It depends on the problem and the fix. A lender may ask for the engineer's report before the loan offer, lend on condition the work is done, or refuse. Tell the lender before the valuation rather than after.
Who pays for a pyrite test?
The buyer, as part of the survey, unless the seller already has a recent test. The seller must agree to the sample being taken and the hole made good.
Read next
- Cost of buying a house →
- Buying timeline planner →
- Renovating an older home: survey first, cost the works, then the money and the grants
- Buying a derelict house: the grant, the survey, the mortgage problem and a realistic budget
- The mortgage valuation: the fee, the visit and a low valuation
- The Vacant Property Refurbishment Grant: up to €70,000 for an empty home
- Journey: first time buyer
- Journey: moving home
- Journey: vacant home